Request a call

Your title

Phone

Preferable hours of contacting you?

Contact us Questionnaire

News

30.11.2015

КТО-50.К20.П by the order of JSC AK Altynalmas is sent to Kazakhstan

Safe Technologies plants are widely known not only in Russia, but also in other countries. On 27th of November 2015 one of the most demanded plants КТО-50.К20.П, was sent to the customer’s premises. The capacity is 50 kg per hour. One of the largest [..] 

Detailed »
13.11.2015

The challenges posed by recycling wastewater from oil and gas wells

Each year, the oil and gas industry produces more than 800 billion gallons of wastewater. Coupling massive volumes of waste generated over the life of the well and millions of gallons of water needed to hydraulically fracture each well, it is easy to [..] 

Detailed »
29.10.2015

Updated legislation on waste, fertilisers, and water reuse

Circular Economy package introduced by European Commission will reveal updated rules and initiatives in industrial, food, construction waste management’s industries. The document will indicate the probable direction of executive thinking of replacement [..] 

Detailed »
16.10.2015

Marine incinerator КТО-50.СИ is shipped to Admiralty Shipyards

Ship incinerator КТО-50.СИ has successfully passed factory tests and shipped to the Customer on time. КТО-50.СИ is an equipment with input capacity of 50 kg per hour. It will be operated on board of the Ilya Muromets icebreaker, which delivery [..] 

Detailed »
8.10.2015

KTO-50.K20 continues to work on Kuyumbinsky oil and gas field in Krasnoyarsk

Incinerator KTO–50.K20, made by request of OOO Slavneft-Krasnoyarskneftegaz (SN-KNG), which was commissioned last summer for Kuyumbinsky oil and gas field, continues successfully operation. The plant is designed for thermal treatment of industrial and [..] 

Detailed »
6.10.2015

The incinerator КТО-50.К20 is commissioned at the Amethyst field

Chief installation and commissioning of the incinerator КТО-50.К20 have been completed on Amethyst gold field in the Kamchatka territory at the end of September. The equipment has successfully passed acceptance tests. Specialists of Safe Technologies [..] 

Detailed »
11.08.2015

КТО-50 К20.П is shipped to Kamchatka region

Waste Thermal Treatment Facility КТО-50 К20.П was delivered to the port of Kamchatka, from where it will be transferred to the  Amethyst gold field deposit. The incinerator is designed for sanitary and industrial waste recovery, which are formed [..] 

Detailed »
3.08.2015

Solemn ceremony launch of the Waste Thermal Treatment Facility KTO-500 in Yaroslavl

On 28th of July Yaroslavl region held the ceremonial launch of the Waste Thermal Treatment Facility KTO-500. The ceremony was opened by the President of JSC Russian Railways Vladimir Yakunin, the Governor of Yaroslavl Sergei Jastrebov, the Head of Rospotrebnadzor [..] 

Detailed »
28.07.2015

Safe Technologies received The Certificate of Recognition

On 20th of July, ST Industrial Group obtained Certificate of Recognition, approved by The Russian Maritime Register of Shipping (RMRS). The company is certified as a manufacturer of incinerator, brand name type КТО-50.СИ (ship incinerators). The [..] 

Detailed »
27.07.2015

Heat exchanger for КТО-1000 is sent to Ust-Luga port

Safe Technologies IG has completed production and painting of the heat exchanger for incinerator KTO-1000. The Commercial Sea Port of Ust-Luga is presently underway for the construction of КТО-1000. The incinerator is developed for thermal neutralization [..] 

Detailed »